Commercial interior alteration / remodel

Interior renovation of an existing commercial space (non-structural to structural).

partialHB 803: n/areviewed never

Who can pull the permit

  • CGCCertified General Contractor
  • CBCCertified Building Contractor

Subs under the prime's permit: EC, ER, CFC, RF, CAC, CMC, RA

Decision — first matching row wins

#WhenPermitTypeReason
1change_use is yesyesBuilding — Commercial Alteration + Change of OccupancyA change of occupancy triggers a full code review of the new use (egress, occupant load, accessibility, fire, parking, energy) on top of the alteration.
2otherwiseyesBuilding — Commercial Alteration (with MEP subs + fire review)Commercial alterations require signed/sealed drawings for the scope, MEP sub-permits, fire review, and accessibility upgrades along the path of travel.

Inputs the rule needs

  • change_useChange of occupancy / use?
  • structuralStructural changes (walls, openings, loads)?

Documents (base)

  1. Owner authorization / signed permit application (owner or agent signature, notarized where the authority requires)
  2. Signed & sealed drawings for the altered area + affected MEP
  3. Life-safety / egress plan; accessibility path-of-travel
  4. Fire review
  5. Notice of Commencement — recorded with the Clerk of Court and a certified copy (or notarised statement of filing) given to the building department BEFORE the first inspection. Statutory floor is a direct contract over $5,000 (FS 713.135(1)(e)); HVAC repair/replace under $15,000 exempt; lien-law protection applies above $2,500 (FS 713.02(5)). Authorities differ: Collier applies $2,500 (Bulletin B-44, pool checklist) and charges a $5 NOC admin fee; Lee will not ISSUE the permit until the NOC is recorded ($5,000+); Fort Myers, Bonita, Fort Myers Beach $5,000; Marco Island / Sanibel per statute (posted on site before first inspection)
  6. Contractor registration current with the county (license, GL insurance, workers' comp or exemption on file)