Commercial / ground-mount solar array

Ground-mounted or commercial rooftop PV beyond a single home.

inferredHB 803: excludedreviewed never

Who can pull the permit

  • ECCertified Electrical Contractor
  • ERRegistered Electrical Contractor
  • SPEC-SOLARSolar (state CVC / county specialty)
  • CGCCertified General Contractor
  • CBCCertified Building Contractor

Decision — first matching row wins

#WhenPermitTypeReason
1otherwiseyesBuilding (structural) + Electrical — Solar PV; site/ERP if ground-mountCommercial PV needs signed/sealed structural + electrical, utility interconnection, and — for ground-mount — site development, stormwater and setback review; fire access pathways apply on rooftops.

Inputs the rule needs

  • groundGround-mounted?

Documents (base)

  1. Owner authorization / signed permit application (owner or agent signature, notarized where the authority requires)
  2. Signed & sealed structural + electrical
  3. Racking product approvals; fire access pathways (rooftop)
  4. Site / stormwater plan (ground-mount)
  5. Notice of Commencement — recorded with the Clerk of Court and a certified copy (or notarised statement of filing) given to the building department BEFORE the first inspection. Statutory floor is a direct contract over $5,000 (FS 713.135(1)(e)); HVAC repair/replace under $15,000 exempt; lien-law protection applies above $2,500 (FS 713.02(5)). Authorities differ: Collier applies $2,500 (Bulletin B-44, pool checklist) and charges a $5 NOC admin fee; Lee will not ISSUE the permit until the NOC is recorded ($5,000+); Fort Myers, Bonita, Fort Myers Beach $5,000; Marco Island / Sanibel per statute (posted on site before first inspection)
  6. Contractor registration current with the county (license, GL insurance, workers' comp or exemption on file)