Communications tower / antenna / small cell

Cell tower, rooftop antenna, or right-of-way small-cell node.

inferredHB 803: n/areviewed never

Who can pull the permit

  • CGCCertified General Contractor
  • ECCertified Electrical Contractor
  • ERRegistered Electrical Contractor

Decision — first matching row wins

#WhenPermitTypeReason
1in_row is yesyesROW / Small Cell permit (FS 337.401) + electricalSmall-cell nodes in the ROW are governed by the state's Advanced Wireless Infrastructure law (FS 337.401) with a shot-clock and per-pole rules, plus electrical.
2otherwiseyesBuilding — Tower/Antenna (structural + FAA/FCC + zoning)Towers need signed/sealed structural, FAA/FCC clearances, and zoning/land-use review (setbacks, height, fall zone); airport overlays apply near Naples/RSW/Page Field.

Inputs the rule needs

  • in_rowIn the public right-of-way (small cell)?

Documents (base)

  1. Owner authorization / signed permit application (owner or agent signature, notarized where the authority requires)
  2. Signed & sealed structural / foundation
  3. FAA/FCC determinations
  4. Zoning / land-use approval; airport overlay check
  5. Electrical
  6. Contractor registration current with the county (license, GL insurance, workers' comp or exemption on file)