Dock / boat lift / seawall

Marine construction on a canal, bay or Gulf frontage.

partialHB 803: excludedreviewed never

Who can pull the permit

  • SPEC-MARINEMarine / Seawall / Dock (county specialty)
  • CGCCertified General Contractor
  • CBCCertified Building Contractor
  • CRCCertified Residential Contractor
  • OWNER-BUILDEROwner-occupied 1–2 family (FS 489.103(7))

Decision — first matching row wins

#WhenPermitTypeReason
1otherwiseyesBuilding — Marine Structure (+ FDEP / USACE)All marine construction is permitted work with state and often federal authorization (FDEP ERP or exemption letter, USACE).

Inputs the rule needs

  • typeType

Documents (base)

  1. Owner authorization / signed permit application (owner or agent signature, notarized where the authority requires)
  2. Signed & sealed marine engineering
  3. FDEP authorization / exemption determination
  4. USACE permit or nationwide permit verification
  5. Manatee protection / seagrass survey where required
  6. Contractor registration current with the county (license, GL insurance, workers' comp or exemption on file)