Driveway culvert / swale work
Installing or modifying a culvert pipe or drainage swale at a driveway connection.
inferredHB 803: n/areviewed never
Who can pull the permit
- SPEC-CONCRETEConcrete Forming & Placing (county specialty)
- CUCCertified Underground Utility & Excavation Contractor
- CGCCertified General Contractor
- CBCCertified Building Contractor
- CRCCertified Residential Contractor
- NONENo contractor license
- OWNER-BUILDEROwner-occupied 1–2 family (FS 489.103(7))
Decision — first matching row wins
| # | When | Permit | Type | Reason |
|---|---|---|---|---|
| 1 | otherwise | yes | Right-of-Way Permit (drainage/culvert) | Culverts and swales sit in or affect the county's drainage system within the right-of-way — a ROW/stormwater permit from the transportation or stormwater division, separate from a building permit, and typically tied to a specific pipe size/invert elevation to keep the roadside ditch flowing. |
Documents (base)
- Owner authorization / signed permit application (owner or agent signature, notarized where the authority requires)
- ROW permit application with culvert size/invert elevations
- Traffic control plan if work affects the travel lane