Driveway culvert / swale work

Installing or modifying a culvert pipe or drainage swale at a driveway connection.

inferredHB 803: n/areviewed never

Who can pull the permit

  • SPEC-CONCRETEConcrete Forming & Placing (county specialty)
  • CUCCertified Underground Utility & Excavation Contractor
  • CGCCertified General Contractor
  • CBCCertified Building Contractor
  • CRCCertified Residential Contractor
  • NONENo contractor license
  • OWNER-BUILDEROwner-occupied 1–2 family (FS 489.103(7))

Decision — first matching row wins

#WhenPermitTypeReason
1otherwiseyesRight-of-Way Permit (drainage/culvert)Culverts and swales sit in or affect the county's drainage system within the right-of-way — a ROW/stormwater permit from the transportation or stormwater division, separate from a building permit, and typically tied to a specific pipe size/invert elevation to keep the roadside ditch flowing.

Documents (base)

  1. Owner authorization / signed permit application (owner or agent signature, notarized where the authority requires)
  2. ROW permit application with culvert size/invert elevations
  3. Traffic control plan if work affects the travel lane