Paver / concrete driveway, walkway or patio
Flatwork on private property and/or the apron in the public right-of-way.
inferredHB 803: eligiblereviewed never
Who can pull the permit
- SPEC-PAVERPaving / Paver Installation (county specialty)
- SPEC-CONCRETEConcrete Forming & Placing (county specialty)
- CGCCertified General Contractor
- CBCCertified Building Contractor
- CRCCertified Residential Contractor
- OWNER-BUILDEROwner-occupied 1–2 family (FS 489.103(7))
Decision — first matching row wins
| # | When | Permit | Type | Reason |
|---|---|---|---|---|
| 1 | in_row is yes | yes | Right-of-Way Permit (+ building permit where required) | Any work in the county/city right-of-way (driveway apron, culvert, swale) needs a ROW permit from the transportation/engineering side — separate from building. |
| 2 | new_impervious is yes | conditional | Site / drainage review may apply | New impervious area can trigger lot-coverage and drainage review depending on zoning district and size. Reviewer to confirm. |
| 3 | otherwise | conditional | Often no building permit for like-for-like private flatwork | Replacing existing private driveway/patio surface is commonly exempt, but Collier and Lee differ on when a permit is required for new hardscape. Reviewer to confirm per authority. |
Inputs the rule needs
- in_rowTouches the public right-of-way (apron, swale, sidewalk)?required
- new_imperviousAdding new impervious area (not replacing existing)?
Documents (base)
- Owner authorization / signed permit application (owner or agent signature, notarized where the authority requires)
- Site plan / survey showing property lines, setbacks, easements, septic and the proposed work with impervious area calc
- ROW permit application + traffic control if in ROW
- Contractor registration current with the county (license, GL insurance, workers' comp or exemption on file)