Registry
Mechanical / Electrical / Plumbing
Electrical panel / service upgrade
Panel swap, service upgrade, meter can.
partialHB 803: excludedreviewed never
Who can pull the permit
- ECCertified Electrical Contractor
- ERRegistered Electrical Contractor
- OWNER-BUILDEROwner-occupied 1–2 family (FS 489.103(7))
Decision — first matching row wins
| # | When | Permit | Type | Reason |
|---|---|---|---|---|
| 1 | otherwise | yes | Electrical — Service/Panel | Service and panel work is permitted; utility (FPL/LCEC) release required after inspection. |
Documents (base)
- Electrical permit application (service size, load calc if upgrade)
- Contractor registration current with the county (license, GL insurance, workers' comp or exemption on file)