Registry
Site & Exterior
Fence repair / replacement (existing fence, same footprint)
Repairing or replacing an existing fence in place — not a new fence line.
partialHB 803: eligiblereviewed 2026-08-18
Who can pull the permit
- SPEC-FENCEFence Erection (county specialty)
- CGCCertified General Contractor
- CBCCertified Building Contractor
- CRCCertified Residential Contractor
- NONENo contractor license
- OWNER-BUILDEROwner-occupied 1–2 family (FS 489.103(7))
Decision — first matching row wins
| # | When | Permit | Type | Reason |
|---|---|---|---|---|
| 1 | panels_only is yes | conditional | Minor in-kind repair — often treated as ordinary repair; confirm with the authority | Neither county publishes a fence-REPAIR exemption in its current code: Lee's LDC §6-117 (re-verified 2026-08-18) contains no fence-repair or certificate-of-compliance carve-out, and Collier's 311 guidance says any fence installation needs a permit. In-kind replacement of a few pickets or a post is generally handled as ordinary repair at the counter, but full-run replacement is a new fence permit. Under HB 803 a sub-$7,500 residential fence outside a flood zone can be handled by written exemption request. |
| 2 | otherwise | yes | Building — Fence (replacement is a new fence permit) | Replacing a fence run — even on the same line — is treated as a new fence in both counties: Collier requires a permit for any fence installation, and Lee requires one for any fence over 25 inches (LDC §34-1742). See the Fence job type for heights, pool-barrier and corner-lot rules. |
Inputs the rule needs
- panels_onlyReplacing a few pickets/panels/posts in kind (no change to line, height or material)?required
- height_ftFence height (ft)
Documents (base)
- Owner authorization / signed permit application (owner or agent signature, notarized where the authority requires)
- Site plan / survey showing property lines, setbacks, easements, septic and the proposed work with the fence line
- Contractor registration current with the county (license, GL insurance, workers' comp or exemption on file)
Sources
- Lee County LDC §6-117 — Improvements or repairs not requiring a permit (12-month cumulative $500 cap on listed dwelling items) checked 2026-08-18
- Florida Building Code, Building §105.1 (Permits required) & §105.2 (Work exempt from permit)
- Collier County Land Development Code (Municode)
- Lee County Land Development Code (Municode)
- Ch. 2026-63 (CS/CS/HB 803) — FS 553.79(1)(g): single-family work valued under $7,500 exempt on written request; excludes flood-hazard parcels and electrical/plumbing/structural/mechanical/gas work checked 2026-08-18