Mechanical / Electrical / Plumbing

Standby generator (with transfer switch)

Whole-house standby on LP or natural gas.

partialHB 803: excludedreviewed never

Who can pull the permit

  • ECCertified Electrical Contractor
  • ERRegistered Electrical Contractor
  • CGCCertified General Contractor
  • CBCCertified Building Contractor
  • CRCCertified Residential Contractor
  • OWNER-BUILDEROwner-occupied 1–2 family (FS 489.103(7))

Subs under the prime's permit: CFC, RF

Decision — first matching row wins

#WhenPermitTypeReason
1otherwiseyesElectrical + Gas (+ Building for pad/setbacks)Generator installs need electrical (transfer switch), gas piping (LP or NG), and setback/noise review; LP tank placement is regulated separately.

Inputs the rule needs

  • fuelFuel

Documents (base)

  1. Owner authorization / signed permit application (owner or agent signature, notarized where the authority requires)
  2. Site plan / survey showing property lines, setbacks, easements, septic and the proposed work with generator + tank setbacks
  3. Electrical one-line / transfer switch spec
  4. Gas piping sizing / LP tank placement (FDACS LP rules)
  5. Notice of Commencement — recorded with the Clerk of Court and a certified copy (or notarised statement of filing) given to the building department BEFORE the first inspection. Statutory floor is a direct contract over $5,000 (FS 713.135(1)(e)); HVAC repair/replace under $15,000 exempt; lien-law protection applies above $2,500 (FS 713.02(5)). Authorities differ: Collier applies $2,500 (Bulletin B-44, pool checklist) and charges a $5 NOC admin fee; Lee will not ISSUE the permit until the NOC is recorded ($5,000+); Fort Myers, Bonita, Fort Myers Beach $5,000; Marco Island / Sanibel per statute (posted on site before first inspection)
  6. Contractor registration current with the county (license, GL insurance, workers' comp or exemption on file)