HVAC change-out (like-for-like)

Replace condenser/air handler.

partialHB 803: excludedreviewed never

Who can pull the permit

  • CACCertified Air-Conditioning Contractor (Class A)
  • CMCCertified Mechanical Contractor
  • RARegistered Air-Conditioning Contractor
  • CGCCertified General Contractor
  • CBCCertified Building Contractor
  • CRCCertified Residential Contractor
  • OWNER-BUILDEROwner-occupied 1–2 family (FS 489.103(7))

Decision — first matching row wins

#WhenPermitTypeReason
1otherwiseyesMechanical — HVAC Change-outHVAC replacements are permitted (energy code, tie-downs, electrical disconnect); mechanical work is carved out of HB 803. NOC: HVAC repair/replace under $15,000 is exempt from the NOC-before-inspection rule (FS 713.135).

Documents (base)

  1. Mechanical permit application with equipment AHRI/energy data
  2. Tie-down / hurricane strap detail
  3. Notice of Commencement — recorded with the Clerk of Court and a certified copy (or notarised statement of filing) given to the building department BEFORE the first inspection. Statutory floor is a direct contract over $5,000 (FS 713.135(1)(e)); HVAC repair/replace under $15,000 exempt; lien-law protection applies above $2,500 (FS 713.02(5)). Authorities differ: Collier applies $2,500 (Bulletin B-44, pool checklist) and charges a $5 NOC admin fee; Lee will not ISSUE the permit until the NOC is recorded ($5,000+); Fort Myers, Bonita, Fort Myers Beach $5,000; Marco Island / Sanibel per statute (posted on site before first inspection)
  4. Contractor registration current with the county (license, GL insurance, workers' comp or exemption on file)