Attic insulation top-off & minor drywall repair

Blown-in or batt attic insulation, and drywall patch/repair not touching a fire-rated wall.

partialHB 803: n/areviewed never

Who can pull the permit

  • NONENo contractor license
  • CGCCertified General Contractor
  • CBCCertified Building Contractor
  • CRCCertified Residential Contractor
  • OWNER-BUILDEROwner-occupied 1–2 family (FS 489.103(7))

Decision — first matching row wins

#WhenPermitTypeReason
1fire_wall is yesyesBuilding — Fire-Rated Assembly RepairRepairs to a fire-separation wall (garage-to-house, duplex/townhome demising wall) must restore the rated assembly and are inspected — not covered by any minor-repair exemption.
2drywall_sqft > 100conditionalBuilding Permit likely required above Lee's 100 sq ft thresholdLee County's LDC §6-117 exempts 100 sq ft or less of drywall with no fire-separation wall involved; above that, or in Collier (no confirmed equivalent), treat as needing a permit pending reviewer confirmation.
3otherwisenoAttic insulation top-off is non-structural and not electrical/plumbing/mechanical — no permit. Drywall repair of 100 sq ft or less with no fire-rated wall involved is expressly listed as not requiring a permit in Lee County (LDC §6-117); Collier has no confirmed equivalent line but this is standard FBC §105.2 minor-repair territory.

Inputs the rule needs

  • drywall_sqftDrywall area repaired (sq ft)
  • fire_wallInvolves a fire-rated / fire-separation wall (garage-to-house, unit-to-unit)?

Documents (base)