Interior

Interior demolition (commercial or residential)

Gutting an interior — removing finishes, partitions, MEP — down to shell.

inferredHB 803: n/areviewed never

Who can pull the permit

  • SPEC-DEMODemolition (county specialty)
  • CGCCertified General Contractor
  • CBCCertified Building Contractor
  • CRCCertified Residential Contractor

Decision — first matching row wins

#WhenPermitTypeReason
1otherwiseyesBuilding — Interior Demolition (with utility caps; asbestos survey)Interior demolition is permitted work: utilities are capped/disconnected, a pre-1981 building needs an asbestos survey (FDEP NESHAP), and removing structural or fire-rated assemblies adds engineering review.

Inputs the rule needs

  • load_bearingRemoving load-bearing or fire-rated assemblies?

Documents (base)

  1. Owner authorization / signed permit application (owner or agent signature, notarized where the authority requires)
  2. Demolition scope; utility disconnect/cap
  3. Asbestos survey + FDEP NESHAP notice where applicable
  4. Engineer's letter if structural
  5. Contractor registration current with the county (license, GL insurance, workers' comp or exemption on file)