Registry
Interior
Interior demolition (commercial or residential)
Gutting an interior — removing finishes, partitions, MEP — down to shell.
inferredHB 803: n/areviewed never
Who can pull the permit
- SPEC-DEMODemolition (county specialty)
- CGCCertified General Contractor
- CBCCertified Building Contractor
- CRCCertified Residential Contractor
Decision — first matching row wins
| # | When | Permit | Type | Reason |
|---|---|---|---|---|
| 1 | otherwise | yes | Building — Interior Demolition (with utility caps; asbestos survey) | Interior demolition is permitted work: utilities are capped/disconnected, a pre-1981 building needs an asbestos survey (FDEP NESHAP), and removing structural or fire-rated assemblies adds engineering review. |
Inputs the rule needs
- load_bearingRemoving load-bearing or fire-rated assemblies?
Documents (base)
- Owner authorization / signed permit application (owner or agent signature, notarized where the authority requires)
- Demolition scope; utility disconnect/cap
- Asbestos survey + FDEP NESHAP notice where applicable
- Engineer's letter if structural
- Contractor registration current with the county (license, GL insurance, workers' comp or exemption on file)