Cleared
Registry

Interior

Interior remodel — moving or removing walls

Wall removal, new openings, structural beams.

partialHB 803: excludedreviewed never

Who can pull the permit

  • CGCCertified General Contractor
  • CBCCertified Building Contractor
  • CRCCertified Residential Contractor
  • OWNER-BUILDEROwner-occupied 1–2 family (FS 489.103(7))

Decision — first matching row wins

#WhenPermitTypeReason
1otherwiseyesBuilding — Interior AlterationStructural alteration requires a permit and, for load-bearing work, engineered details.

Inputs the rule needs

  • load_bearingLoad-bearing wall involved?

Documents (base)

  1. Owner authorization / signed permit application (owner or agent signature, notarized where the authority requires)
  2. Floor plan (existing/proposed)
  3. Engineer's letter/beam detail if load-bearing
  4. Notice of Commencement — recorded with the Clerk of Court and a certified copy (or notarised statement of filing) given to the building department BEFORE the first inspection. Statutory floor is a direct contract over $5,000 (FS 713.135(1)(e)); HVAC repair/replace under $15,000 exempt; lien-law protection applies above $2,500 (FS 713.02(5)). Authorities differ: Collier applies $2,500 (Bulletin B-44, pool checklist) and charges a $5 NOC admin fee; Lee will not ISSUE the permit until the NOC is recorded ($5,000+); Fort Myers, Bonita, Fort Myers Beach $5,000; Marco Island / Sanibel per statute (posted on site before first inspection)
  5. Contractor registration current with the county (license, GL insurance, workers' comp or exemption on file)

Sources