Modular / manufactured commercial building

Factory-built modular office/classroom/retail set on site.

inferredHB 803: n/areviewed never

Who can pull the permit

  • CGCCertified General Contractor
  • CBCCertified Building Contractor

Decision — first matching row wins

#WhenPermitTypeReason
1otherwiseyesBuilding — Modular set (state-approved module + site foundation/MEP/tie-down)Modular buildings carry a state DBPR insignia for the module itself, but the site work — foundation, tie-downs, MEP connections, accessibility, fire and CO — is permitted and inspected locally.

Documents (base)

  1. Owner authorization / signed permit application (owner or agent signature, notarized where the authority requires)
  2. State modular approval / insignia
  3. Foundation, tie-down and MEP-connection drawings
  4. Accessibility & fire
  5. Notice of Commencement — recorded with the Clerk of Court and a certified copy (or notarised statement of filing) given to the building department BEFORE the first inspection. Statutory floor is a direct contract over $5,000 (FS 713.135(1)(e)); HVAC repair/replace under $15,000 exempt; lien-law protection applies above $2,500 (FS 713.02(5)). Authorities differ: Collier applies $2,500 (Bulletin B-44, pool checklist) and charges a $5 NOC admin fee; Lee will not ISSUE the permit until the NOC is recorded ($5,000+); Fort Myers, Bonita, Fort Myers Beach $5,000; Marco Island / Sanibel per statute (posted on site before first inspection)
  6. Contractor registration current with the county (license, GL insurance, workers' comp or exemption on file)