Registry
Site & Exterior
Outdoor kitchen
Built-in grill island with utilities.
inferredHB 803: ambiguousreviewed never
Who can pull the permit
- CGCCertified General Contractor
- CBCCertified Building Contractor
- CRCCertified Residential Contractor
- OWNER-BUILDEROwner-occupied 1–2 family (FS 489.103(7))
Subs under the prime's permit: EC, ER, CFC, RF
Decision — first matching row wins
| # | When | Permit | Type | Reason |
|---|---|---|---|---|
| 1 | (utilities is yes OR roofed is yes) | yes | Building + trade sub-permits | Utilities or a roofed structure make it permitted work. |
| 2 | otherwise | no | — | A freestanding grill island with no utilities on an existing patio is finish/landscape work — no permit. |
Inputs the rule needs
- utilitiesGas, water or electrical run to it?required
- roofedUnder a new roof/structure?
Documents (base)
- Owner authorization / signed permit application (owner or agent signature, notarized where the authority requires)
- Site plan / survey showing property lines, setbacks, easements, septic and the proposed work
- Contractor registration current with the county (license, GL insurance, workers' comp or exemption on file)