Outdoor kitchen

Built-in grill island with utilities.

inferredHB 803: ambiguousreviewed never

Who can pull the permit

  • CGCCertified General Contractor
  • CBCCertified Building Contractor
  • CRCCertified Residential Contractor
  • OWNER-BUILDEROwner-occupied 1–2 family (FS 489.103(7))

Subs under the prime's permit: EC, ER, CFC, RF

Decision — first matching row wins

#WhenPermitTypeReason
1(utilities is yes OR roofed is yes)yesBuilding + trade sub-permitsUtilities or a roofed structure make it permitted work.
2otherwisenoA freestanding grill island with no utilities on an existing patio is finish/landscape work — no permit.

Inputs the rule needs

  • utilitiesGas, water or electrical run to it?required
  • roofedUnder a new roof/structure?

Documents (base)

  1. Owner authorization / signed permit application (owner or agent signature, notarized where the authority requires)
  2. Site plan / survey showing property lines, setbacks, easements, septic and the proposed work
  3. Contractor registration current with the county (license, GL insurance, workers' comp or exemption on file)