Cleared
Registry

Site & Exterior

Patio cover / attached lanai roof (solid roof, not screen)

Solid-roof structure attached to the house over an existing patio — distinct from a screen cage (see Screen enclosure) and an open pergola.

partialHB 803: ambiguousreviewed never

Who can pull the permit

  • CGCCertified General Contractor
  • CBCCertified Building Contractor
  • CRCCertified Residential Contractor
  • SPEC-ALUMINUMAluminum / Screen Enclosure (county specialty)
  • OWNER-BUILDEROwner-occupied 1–2 family (FS 489.103(7))

Decision — first matching row wins

#WhenPermitTypeReason
1enclosed_sides is yesyesBuilding — Room Addition/EnclosureEnclosing sides converts this from a covered patio to an addition — see Room addition; full structural/energy review applies.
2otherwiseyesBuilding — Patio Cover / Attached StructureA solid-roof structure attached to the house is a wind-loaded addition to the building envelope; engineered plans, product approvals for the roof panels, and attachment-to-house details are required regardless of whether the sides stay open.

Inputs the rule needs

  • insulatedInsulated panel roof (vs. simple solid roof)?
  • enclosed_sidesAny side being enclosed with wall/glass (vs. open-sided)?

Documents (base)

  1. Owner authorization / signed permit application (owner or agent signature, notarized where the authority requires)
  2. Site plan / survey showing property lines, setbacks, easements, septic and the proposed work
  3. Signed & sealed structural/attachment details or Florida Product Approval for a manufactured panel system
  4. Notice of Commencement — recorded with the Clerk of Court and a certified copy (or notarised statement of filing) given to the building department BEFORE the first inspection. Statutory floor is a direct contract over $5,000 (FS 713.135(1)(e)); HVAC repair/replace under $15,000 exempt; lien-law protection applies above $2,500 (FS 713.02(5)). Authorities differ: Collier applies $2,500 (Bulletin B-44, pool checklist) and charges a $5 NOC admin fee; Lee will not ISSUE the permit until the NOC is recorded ($5,000+); Fort Myers, Bonita, Fort Myers Beach $5,000; Marco Island / Sanibel per statute (posted on site before first inspection)
  5. Contractor registration current with the county (license, GL insurance, workers' comp or exemption on file)

Sources