Registry
Pools
Pool demolition / fill-in
Removing or abandoning-in-place (fill and cap) an existing pool.
partialHB 803: excludedreviewed never
Who can pull the permit
- SPEC-DEMODemolition (county specialty)
- CPCCertified Commercial Pool/Spa Contractor
- RPCertified Residential Pool/Spa Contractor
- CSPCertified Swimming Pool/Spa Servicing Contractor
- CGCCertified General Contractor
- CBCCertified Building Contractor
- CRCCertified Residential Contractor
- OWNER-BUILDEROwner-occupied 1–2 family (FS 489.103(7))
Decision — first matching row wins
| # | When | Permit | Type | Reason |
|---|---|---|---|---|
| 1 | otherwise | yes | Building — Demolition (Pool) | Removing or abandoning a pool is demolition under FBC §105.1; the shell must be perforated for drainage (fill-in-place method) or fully removed, equipment disconnected, and the electrical bonding/circuit properly terminated by an EC/ER. |
Inputs the rule needs
- methodMethodrequired
Documents (base)
- Owner authorization / signed permit application (owner or agent signature, notarized where the authority requires)
- Electrical/gas disconnect confirmation
- Fill/compaction method statement
- Contractor registration current with the county (license, GL insurance, workers' comp or exemption on file)