Cleared
Registry

Commercial

Restaurant / food-service build-out

Commercial kitchen, grease/hood, grease trap, dining assembly.

inferredHB 803: n/areviewed never

Who can pull the permit

  • CGCCertified General Contractor
  • CBCCertified Building Contractor

Subs under the prime's permit: EC, ER, CFC, RF, CAC, CMC, RA

Decision — first matching row wins

#WhenPermitTypeReason
1otherwiseyesBuilding — Commercial (food service) with hood, grease interceptor, fire suppressionFood-service build-outs stack building, MEP, Type I hood + Ansul fire-suppression, grease interceptor (utility/plumbing), assembly egress, and Health Department (DBPR Hotels & Restaurants, or DOH) plan review.

Documents (base)

  1. Owner authorization / signed permit application (owner or agent signature, notarized where the authority requires)
  2. Architectural + MEP + kitchen equipment plan
  3. Hood & fire-suppression (Type I) drawings
  4. Grease interceptor sizing / utility approval
  5. Health Department / DBPR H&R plan review
  6. Assembly egress & accessibility
  7. Notice of Commencement — recorded with the Clerk of Court and a certified copy (or notarised statement of filing) given to the building department BEFORE the first inspection. Statutory floor is a direct contract over $5,000 (FS 713.135(1)(e)); HVAC repair/replace under $15,000 exempt; lien-law protection applies above $2,500 (FS 713.02(5)). Authorities differ: Collier applies $2,500 (Bulletin B-44, pool checklist) and charges a $5 NOC admin fee; Lee will not ISSUE the permit until the NOC is recorded ($5,000+); Fort Myers, Bonita, Fort Myers Beach $5,000; Marco Island / Sanibel per statute (posted on site before first inspection)
  8. Contractor registration current with the county (license, GL insurance, workers' comp or exemption on file)

Sources