Cleared
Registry

Land & Water

Seawall repair / cap repair (existing wall)

Repairing, capping, or partially rebuilding an existing seawall — not a new wall.

inferredHB 803: excludedreviewed never

Who can pull the permit

  • SPEC-MARINEMarine / Seawall / Dock (county specialty)
  • CGCCertified General Contractor
  • CBCCertified Building Contractor
  • CRCCertified Residential Contractor
  • OWNER-BUILDEROwner-occupied 1–2 family (FS 489.103(7))

Decision — first matching row wins

#WhenPermitTypeReason
1scope = "full"yesBuilding — Marine Structure (new); see Dock/boat lift/seawallA full seawall replacement is functionally a new structure for permitting purposes — the same FDEP/USACE/building-permit stack as new construction.
2otherwiseyesBuilding — Marine Structure Repair (lighter FDEP review than new construction)Repair or cap work on an existing, in-place seawall still needs the county building permit for the structure, but often qualifies for FDEP's minimal-impact General Permit/exemption tier (repair-in-kind, no waterward encroachment) rather than the fuller review a new wall triggers — confirm the specific FDEP tier against the repair's exact footprint before assuming the lighter path applies.

Inputs the rule needs

  • scopeScoperequired

Documents (base)

  1. Owner authorization / signed permit application (owner or agent signature, notarized where the authority requires)
  2. Engineering detail for the repair (cap, panel, tie-back)
  3. FDEP repair/maintenance determination
  4. Contractor registration current with the county (license, GL insurance, workers' comp or exemption on file)

Sources