Below-grade drainage or sewage ejector pump system.
inferredHB 803: excludedreviewed never
Who can pull the permit
- CFCCertified Plumbing Contractor
- RFRegistered Plumbing Contractor
- ECCertified Electrical Contractor
- ERRegistered Electrical Contractor
- CGCCertified General Contractor
- CBCCertified Building Contractor
- CRCCertified Residential Contractor
- OWNER-BUILDEROwner-occupied 1–2 family (FS 489.103(7))
Decision — first matching row wins
| # | When | Permit | Type | Reason |
|---|---|---|---|---|
| 1 | otherwise | yes | Plumbing + Electrical Permit | A sewage lift/ejector station is plumbing work tied to the sanitary system (and, if it discharges to a septic system, needs DOH awareness); the pump's dedicated circuit and any alarm panel are electrical work. A stormwater sump serving only groundwater/foundation drainage still needs the electrical permit for its circuit. |
Inputs the rule needs
- sewageSewage ejector (vs. stormwater/groundwater sump)?
Documents (base)
- Plumbing + electrical permit applications with pump spec
- Contractor registration current with the county (license, GL insurance, workers' comp or exemption on file)