inferredHB 803: n/areviewed never

Who can pull the permit

  • CGCCertified General Contractor
  • CBCCertified Building Contractor

Subs under the prime's permit: EC, ER, CFC, RF, CAC, CMC, RA

Decision — first matching row wins

#WhenPermitTypeReason
1otherwiseyesBuilding — Storage/Industrial (with fire; high-pile & HazMat review if applicable)Warehouse/industrial shells need building + fire review; high-piled storage and hazardous materials add commodity classification, sprinkler design and fire-code review.

Inputs the rule needs

  • high_pileHigh-piled storage (over 12 ft) or hazardous materials?

Documents (base)

  1. Owner authorization / signed permit application (owner or agent signature, notarized where the authority requires)
  2. Signed & sealed shell drawings
  3. Fire sprinkler design; high-pile storage plan if applicable
  4. Site plan / survey showing property lines, setbacks, easements, septic and the proposed work
  5. Notice of Commencement — recorded with the Clerk of Court and a certified copy (or notarised statement of filing) given to the building department BEFORE the first inspection. Statutory floor is a direct contract over $5,000 (FS 713.135(1)(e)); HVAC repair/replace under $15,000 exempt; lien-law protection applies above $2,500 (FS 713.02(5)). Authorities differ: Collier applies $2,500 (Bulletin B-44, pool checklist) and charges a $5 NOC admin fee; Lee will not ISSUE the permit until the NOC is recorded ($5,000+); Fort Myers, Bonita, Fort Myers Beach $5,000; Marco Island / Sanibel per statute (posted on site before first inspection)
  6. Contractor registration current with the county (license, GL insurance, workers' comp or exemption on file)